ECI worked with Leighton Contractors, Q Electrical and Triple M Mechanical Services to design, construct, install and commission a tri-generation system on Level 56 of 111 Eagle St, on the river in the heart of the Brisbane CBD.
ECI engineered, designed, manufactured, installed and commissioned a full turnkey Tri-generation flue system to meet the building’s architectural design requirements as well as stringent Brisbane City Council air policy regulations.
Project Scope
- SCR
- Tri-generation
- Silencers and exhaust system (gas and diesel)
- Boiler exhaust system
- Plant room installation
- Emissions control (oxidation catalyst)