ECI worked with Leighton Contractors, Siganto and Stacey Air Conditioning and Mechanical Contractors to deliver outstanding design innovation in energy efficiency products and emission reduction technologies.
This project achieved a 5 star Green Education V1 rating.
QUT Garden’s Point Campus, on the beautiful Brisbane River in the heart of the CBD, is one of Australia’s premier universities.
ECI’s tailored component design and installation experience provided the facility with the most efficient layout for both operational performance and plant room functionality. The SCR System includes a Continuous Emissions Monitoring System (CEMS) which keeps the exhaust NOx emissions of the gas generator below state regulation limits throughout the complete operation of the Tri-Generation plant.
ECI designed and manufactured all components which included a specifically designed high performance super critical Silencer, natural gas Oxidation Catalyst, Waste Heat Recovery Unit for hot water production and a CEMS controlled SCR System for NOx abatement. All components meet stringent Australian gas appliance and pressure vessel code standards
Project Scope
- SCR
- Silencers and exhaust system
- Emissions control (oxidation catalyst)